Haiti - Reconstruction : Important works of cleaning to Léogâne - HaitiLibre.com : Haiti news 7/7
 New revised electoral calendar (Oct. 28, 2026)





iciHaiti - Fair for Future Careers : «Connecting Talent, Building Our Territories»

Jacmel : Large-scale cleanup campaign

New Swiss Ambassador in Haiti

iciHaiti - Social : Strategic meeting to consolidate social protection gains

iciHaïti - FLASH : Update on the flood toll


more news


Haiti - News : Zapping...

Haiti - FLASH : Hunger reaches record levels in Haiti, and warnings are becoming reality

Message from the President of El Salvador to the Haitian People

Development of the electricity sector in Haiti

Haiti - Leisure : Did you know ? #72


more news


Haiti - Reconstruction : Important works of cleaning to Léogâne


Haiti - Reconstruction : Important works of cleaning to Léogâne

Since their deployment in Haiti, the companies of military engineering Korean and Japanese perform major rehabilitation work to Léogâne. Among them, the demolition and removal of debris from destroyed buildings, repair of roads, cleaning of rivers and most recently the construction of a laundry to the Sanatorium Sigueneau.

To Léogâne, Japanese and Korean companies have made the cleaning at least four rivers in the area of Palmes, from Léogane to Petit-Goave [rivers Momance and Rouyonne, river Cormier to Léogâne, and a fourth river to Petit-Goave].

Rivers, which when they are in flood, invade the communities and roads, destroying homes and plantations, sometimes blocking traffic on the only road [National # 2], linking the Department of the South West, Southeast, Nippes and Grand Anse.

"When the river Rouyonne overflows, it's almost the entire city of Léogane which is flooded and it is impossible, even for large trucks, to use the entrance and exit south of the city Anacaona," said a driver of public transportation ensuring the route Léogane / Carrefour Dufort and Grand Goâve, two localities situated respectively to approximately four and seven kilometers south of Léogâne".

"This is especially the small bridge (located at the south entrance), which was problematic. Its level is not high enough. At the slightest rain, the deposits accumulated and the water invades us," notes a local resident who said he had to leave his house situated about ten meters from the bridge.

The cleaning of rivers, explains the Captain Chal Sun Hwan, in charge of the work is "a long-term work.

This is not done on a specified period. Each time the level of sediment increases, we intervene to prevent possible damage". The work does not summarize to the cleaning of river beds. They include, in some cases, the adoption of measures to prevent overflows during rain showers. "Sometimes we build walls dry in some places," said the engineer Chal Sun Hwan citing as an example the case of the river Rouyonne where "we had to rebuild about 200 meters of walls."

HL/ HaitiLibre / Minustah



Twitter Facebook Rss
Send news to... Daily news...




Why HaitiLibre ? | Contact us | Français
Copyright © 2010 - 2026
Haitilibre.com