Haiti - Politic : Towards the end of the works of the dam on the Marion river - HaitiLibre.com : Haiti news 7/7
 2026-2027 Electoral Calendar, latest official version





Meeting between SEMANAH and the APN

Léogâne : Curfew and security measures

U-20 Football : Our Grenadiers qualify for the Lima 2027 Pan American Games

Great South : CAN strategic mission to Jérémie

Layla Vulcain crowned Young Mayor of Jacmel


more news


Haiti - FLASH : Nearly 250 games now available on «Quiz.HaitiLibre» (September 2026)

Zapping Haiti of September 1st, 2026

Haiti - Agriculture : Several sections of rural roads provisionally accepted in Grand'Anse

World Forum of the Haitian Diaspora

Haiti - Canada : Working meeting on the Haitian diaspora vote


more news


Haiti - Politic : Towards the end of the works of the dam on the Marion river


Haiti - Politic : Towards the end of the works of the dam on the Marion river

On visit recently on the construction site of the hydroelectric micro-hydroelectric dam on the Marion River, in the locality of Grand Bassin, in Terrier Rouge (North-East), Ministers Patrix Sévère (agriculture) and Nader Joiséus (Public works) announced the end of work next November (almost 3 years since the start of construction). Work started in 2018 https://www.haitilibre.com/en/news-24264-haiti-politic-official-inauguration-of-dam-works-on-the-marion-river.html as part of cooperation Cuban and its hydraulic engineers https://www.haitilibre.com/en/news-26713-haiti-technology-towards-a-transfer-of-hydraulic-knowledge-with-cuba.html

Recall that this important infrastructure, in addition to the dam required, among other things : the construction of a reservoir with a capacity of 10 million m3, 3 important earth dikes (for filling), the installation of two conduits of 1.2 m diameter water under concrete and a concrete weir with a maximum capacity of 450 m3/s as well as a 53kw solar pumping station.

This pumping station will allow farmers, in particular rice producers, to facilitate watering operations and guarantee the availability of water for farmers by allowing the irrigation of 10,000 hectares in Grand Bassin, Acul Samedi, Savane Square, Malféti etc... and also allow fish farming...

The technicians are currently carrying out work to protect dike #1 and to install valves to facilitate the installation of the mini power plant and to bring water into the irrigation system...

Regarding access to drinking water for the entire population of the region, water treatment centers will be installed through the National Directorate for Drinking Water and Sanitation (DINEPA).

Officials estimate that the works are at 72% and estimate that in August they will be close to 85%

See also :

https://www.haitilibre.com/en/news-27615-haiti-politic-jovenel-moise-celebrates-may-1st-on-the-dam-site-of-the-marion-river.html

https://www.haitilibre.com/en/news-26713-haiti-technology-towards-a-transfer-of-hydraulic-knowledge-with-cuba.html

https://www.icihaiti.com/en/news-25959-icihaiti-terrier-rouge-follow-up-of-the-works-of-the-dam-and-the-reservoir-of-10-million-m3.html

https://www.haitilibre.com/en/news-24264-haiti-politic-official-inauguration-of-dam-works-on-the-marion-river.html

https://www.haitilibre.com/en/news-22357-haiti-politics-towards-a-cooperation-with-cuba-in-the-construction-of-dams.html

SL/ HaitiLibre



Twitter Facebook Rss
Send news to... Daily news...




Why HaitiLibre ? | Contact us | Français
Copyright © 2010 - 2026
Haitilibre.com