Haiti - Croix-des-Bouquets : Rehabilitation of the road from Shada to Bon Repos - HaitiLibre.com : Haiti news 7/7
 2026-2027 Electoral Calendar, latest official version





235th Bois Caïman : a living memory, a destination to visit (Video)

Haiti's PM visits Lachaux Pond (Camp-Perrin)

iciHaiti - Camp-Perrin : Inauguration of the redevelopment work at the EFACAP in Mersan

Launch of a vaccination campaign (West dept.)

Towards the repair of the Saut-Mathurin hydroelectric power plant


more news


Zapping Haiti of August 15, 2026

Commemoration of the 5th anniversary of the August 14, 2021 earthquake

High-level OAS delegation expected in Haiti

46 Haitians have received scholarships to study in Taiwan (2026-2027) (list)

Haiti - News : Zapping...


more news


Haiti - Croix-des-Bouquets : Rehabilitation of the road from Shada to Bon Repos
07/03/2018 08:08:46

Haiti - Croix-des-Bouquets : Rehabilitation of the road from Shada to Bon Repos

The Mayor of Croix-des-Bouquets, Rony Colin launched at the beginning of the week the rehabilitation works on the RN #1. After this work, all damaged parts will be rehabilitated from Carrefour Shada up to Bon Repos, in the Casimir area.

Mayor Colin, as part of his program "Chanje figi Kwadèboukè" responded to complaints from residents of Bon Repos, where will be rehabilitated the first section between the entrance of the Dorméus Street and the intersection of RN #1 and #3 to facilitate traffic. A dusty and broken section of road that was a real ordeal for the drivers and the passengers who used it.

Heavy equipment, "graiders", trucks, bulldozers, loaders, among others are hard at work on the road. A work applauds by the residents who are delighted by these works that will give a positive image of the area.

HL/ HaitiLibre



Twitter Facebook Rss
Send news to... Daily news...




Why HaitiLibre ? | Contact us | Français
Copyright © 2010 - 2026
Haitilibre.com